Planning and Installing VACUFLO® Built-in Central Va cuum Systems in New Constructionplanninginstalling&NEW CONSTRUCTION
10Installing the Power Unit When installing VACUFLO Twin Motor Power Units, refer to the specifi c installation instructions shipped with the product.
11Installing the Exhaust LineTo ensure the quietest oper-ation possible, a muffl er should be installed on all power units. (Muffl ers are sold separate
H-P PRODUCTS, INC. • Louisville, Ohio 44641 • 1-800-822-8356 • Fax 330-875-7584 • www.vacufl o.com • HVS-828 Rev.9/05Installing a VACUFLO C
2Table of ContentsPlanning a VACUFLO System Layout Inlet Valve Location...
3Inlet Valve LocationCorrect inlet valve placement allows the 30-foot hose to reach every corner of the house (including closets, ceil-ings, walls and
4Selecting a Power UnitSelecting the proper power unit is critical to the overall performance of a system. The System Capabilities Chart (at right) id
5Installing Inlet ValvesSeveral techniques are used when installing inlet valves in new construction homes:• Wall Installation - Before Drywall - Af
6Wall Installation of Inlet Valves (Before Drywall) – 4 Steps1. Determine inlet valve locationsInlet valves are typically located between studs in hal
74. Install plaster guard and nail guardsTo help locate the valve after the drywall is put up, press the red plaster guard insert fi rmly into the face
8Utility Valve Installation A utility valve (shown above) is used in basements, garages, and other areas where tubing is exposed. To install, put the
9Cutting and Cementing PVC Tubing and FittingsMeasuringMeasurements should be taken from the base of the pipe-stop on the inside of the fi tting hub wh
Comments to this Manuals